Processing Material | Copper/Iron/Aluminum |
---|---|
Surface Treatment | Electroplating/Spraying/Oxidation, etc |
Scenes To Be Used | Industrial Power Supply Equipment |
Tolerance | Within 0.1mm |
Precision | According The Drawing Requirements |
Lead Time | 15-25 Days |
Surface Roughness | Electroplating/Spraying/Oxidation, etc |
Features | High Precision And High Appearance |
Processing Type | Processing According To Drawings |