ch

Industrial Hardware

chain one-stop solution

Anode/Oxidation
Processing Material Aluminum
Color Colours
Scenes To Be Used Industrial Power Supply Equipment
Tolerance Within 0.1mm
Precision According The Drawing Requirements
Lead Time 15-25 Days
Surface Roughness Anode/Oxidation
Features High Precision And High Appearance
Processing Type Processing According To Drawings 
   
   
   
   
 
 

Advisory Message