Processing Material | Aluminum/Copper/Iron |
---|---|
Color | Colours |
Scenes To Be Used | Industrial Power Supply Equipment |
Tolerance | Within 0.25mm |
Precision | According The Drawing Requirements |
Lead Time | 15-25 Days |
Surface Roughness | Spray Powder/Spray Paint |
Features | High Precision And High Appearance |
Processing Type | Processing According To Drawings |