ch

Industrial Hardware

chain one-stop solution

Iron Assembled Products
Processing Material Iron
Color According The Drawing Requirements
Scenes to Be Used Industrial Power Supply Equipment.
Tolerance Within 0.1mm
Precision According The Drawing Requirements
Lead Time 15-25 Days
Surface Roughness Blue Zinc/Color Zinc/Plating Nickel/Plating Tin
Features High Precision And High Appearance 
Processing Type Processing According To Drawings
   
   
   
   
 
 

Advisory Message